Burlington Northern Engineering Drawing: Slab Plan/Sections, Bridge 1484.8 - Huston Road (formerly Great Northern), west of Spokane, Washington, Line Segment 037, Milepost 1484.78. Sheet 337 - 6388 - 8, 1971.
Burlington Northern Engineering Drawing: Slab Plan/Unit 3, Bridge 1482.9 - Greenwood (formerly Great Northern), west of Spokane, Washington, Line Segment 037, Milepost 1482.80. Sheet 337 - 6385 - 27, 1971.
Burlington Northern Engineering Drawing: Slab Plan/Units, Bridge 1482.9 - Greenwood (formerly Great Northern), west of Spokane, Washington, Line Segment 037, Milepost 1482.80. Sheet 337 - 6385 - 26, 1971.
Burlington Northern Engineering Drawing: Span Number 1 and 2, Bridge 1 Columbia River, Pasco, Washington. Sheet 1263 - 14, undated.
Burlington Northern Engineering Drawing: Span Number 3 and 4, Bridge 1 Columbia River, Pasco, Washington. Sheet 1263 - 14, undated.
Burlington Northern Engineering Drawing: Steel Design, Signal Bridge, Burnaby, British Columbia, Line Segment 056. Sheet 317 - 6451 - 5, 1968.
Burlington Northern Engineering Drawing: Steel Design, Signal Bridge, Burnaby, British Columbia, Line Segment 056. Sheet 317 - 6451 - 7, 1969.
Burlington Northern Engineering Drawing: Steel Design, Signal Bridges - New Westminster to Willingdon Junction (formerly Great Northern), north of New Westminster, British Columbia, Line Segment 056. Sheet 324 - 8005 - 4, 1977.
Burlington Northern Engineering Drawing: Steel Design, Signal Bridges - Merritt & Berne, Berne, Merritt, Washington, Line Segment 037. Sheet 317 - 6422 - 2, 1966.
Burlington Northern Engineering Drawing: Steel Detail and Bill of Material, Bridge 97 - Midvale Creek (formerly Great Northern), west of Glacier Park, Montana, Line Segment 036, Milepost 1138.2. Sheet 321 - 1400 - 67, 1981.