Burlington Northern Engineering Drawing: Replace Superstructure, Bridge 67 (formerly Northern Pacific), west of Quebec, Washington, Line Segment 041, Milepost 67.8. Sheet 446 - 17, 1984. Note: Steel spans
Burlington Northern Engineering Drawing: Retaining Wall Detail, Bridge 1475.9 - Spokane River (formerly Great Northern), Spokane, Washington, Line Segment 037, Milepost 1475.88. Sheet 330 - 6513 - 4, undated.
Burlington Northern Engineering Drawing: Retaining Wall Extension, Bridge 47.5 - Access Road, east of Skamania, Washington, Line Segment 047, Milepost 47.46. Sheet 315 - 6991 - 4B, 1982.
Burlington Northern Engineering Drawing: Retaining Walls, Bridge 63.5 - Axton Road (formerly Great Northern), north of Brennan, Washington, Line Segment 050, Milepost 105.7. Sheet 372 - 8051 - 5, undated.
Burlington Northern Engineering Drawing: Revision Handrail Layout, Bridge 1402.6 - Burlington Northern Connection to Northern Pacific (formerly Great Northern), near Sandpoint, Montana, Line Segment 036, Milepost 1402.53. Sheet 341 - 6409 - 28A, 1973.
Burlington Northern Engineering Drawing: Revision Pile BAT, Bridge 114.9 - I-5 Access (formerly Northern Pacific), south of Kalama, Washington, Line Segment 052, Milepost 114.9. Sheet 347 - 6774 - 7, 1971.
Burlington Northern Engineering Drawing: Safety Walk, Bridge 194 - Little Muddy River (formerly Great Northern), west of Lakeside, Montana, Line Segment 035, Milepost 155.1. Sheet 142 - 1310 - 34, 1982.
Burlington Northern Engineering Drawing: Safety Walk, Bridge 434 - Beaver Creek (formerly Great Northern), west of Cork, Montana, Line Segment 035, Milepost 310.5. Sheet 142 - 1337 - 19, 1980.
Burlington Northern Engineering Drawing: Safety Walk, Bridge 463.2 - U.S. Forest Service (formerly Great Northern), west of Strater, Montana, Line Segment 035, Milepost 338.61. Sheet 133 - 8048 - 2, 1977.
Burlington Northern Engineering Drawing: Scale - Explanation of Control and Lights. Sheet SK - 1542A - 852, undated.