Burlington Northern Engineering Drawing: Renew Deck Bridge, Bridge 299 - Muddy Creek (formerly Great Northern), Montana, Line Segment 354, Milepost 47.7. Sheet 185 - 2493, 1974.
Burlington Northern Engineering Drawing: Renew Deck Span, Bridge 299 - Muddy Creek (formerly Great Northern), north of Collins, Montana, Line Segment 354, Milepost 45.7. Sheet 185 - 2493 - 59, 1978.
Burlington Northern Engineering Drawing: Renew Deck, Bridge 61.1 - Stillaguamish River (formerly Northern Pacific), east of Arlington, Washington, Line Segment 406, Milepost 7.6. Sheet 444 - 3, 1977.
Burlington Northern Engineering Drawing: Renew Deck/Add Diaphragm, Bridge 22 (formerly Northern Pacific), west of Blossburg, Montana, Line Segment 042, Milepost 22.9. Sheet 441 - 69, 1984. Note: Steel spans
Burlington Northern Engineering Drawing: Renew Drawrest, Bridge 5.1 - Willamette River, north of Willbridge, Oregon, Line Segment 047, Milepost 5.15. Sheet D.E. - TV - 265A, 1979.
Burlington Northern Engineering Drawing: Renew Frame Piers, Bridge 2 (formerly Great Northern), British Columbia, Line Segment 391, Milepost 146.05. Sheet 132 - 4817, 1977.
Burlington Northern Engineering Drawing: Renew Roof, Snow Sheds (formerly Great Northern), Montana, Line Segment 036. Sheet 229 - 2906 - 61, 1970.
Burlington Northern Engineering Drawing: Renew Trainmen's Walk, Bridge 379 (formerly Great Northern), west of Glasgow, Montana, Line Segment 035, Milepost 278.2. Sheet 155 - 2944 - 3, 1970.
Burlington Northern Engineering Drawing: Repair Center Girder, Bridge 465.7 - Broadway (formerly Great Northern), Everett, Washington, Line Segment 037, Milepost 1783.0. Sheet 194 - 1468 - 29, 1980.
Burlington Northern Engineering Drawing: Repair List, Bridge 1487.2 - Old Trails Road (formerly Great Northern), west of Latah Junction, Washington, Line Segment 037, Milepost 1487.15. Sheet 337 - 6389 - 8, 1971.