Burlington Northern Engineering Drawing: Red River Bridge, Bridge 27.1 - Hall Creek (formerly Great Northern), north of Porto Rico, British Columbia, Line Segment 091, Milepost 179.01. Sheet 381 - 8298 - 1, 1980.
Burlington Northern Engineering Drawing: Reinforced Concrete Double 5 Foot X 6 Foot Box, Culverts. Sheet NO - 101, undated.
Burlington Northern Engineering Drawing: Reinforced Concrete Headwall, Culverts. Sheet 00 - 379, 1938.
Burlington Northern Engineering Drawing: Reinforcement Bar Detail, Bridge 1.2 - 5th Avenue (formerly Great Northern), Spokane, Washington, Line Segment 046, Milepost 1.31. Sheet 348 - 6589 - 17, 1971.
Burlington Northern Engineering Drawing: Reinforcement Bar Detail, Bridge 1402.6 - Burlington Northern Connection to Northern Pacific (formerly Great Northern), near Sandpoint, Montana, Line Segment 036, Milepost 1402.53. Sheet 341 - 6409 - 11, 1971.
Burlington Northern Engineering Drawing: Reinforcement Bar Detail, Retaining Wall at C Street and 8th Avenue (formerly Great Northern), west of Spokane, Washington, Line Segment 037, Milepost 1482.02. Sheet 354 - 6711 - 4, 1972.
Burlington Northern Engineering Drawing: Reinforcement Bar, Bridge 0.1 - north Portland Road, North Portland Junction, Oregon, Line Segment 047, Milepost 0.07. Sheet 256 - 6778 - 8, 1973.
Burlington Northern Engineering Drawing: Reinforcement Bars, Bridge 1402.6 - Burlington Northern Connection to Northern Pacific (formerly Great Northern), near Sandpoint, Montana, Line Segment 036, Milepost 1402.53. Sheet 341 - 6409, 1972.
Burlington Northern Engineering Drawing: Reinforcing Bars, Bridge 1475.9 - Spokane River (formerly Great Northern), Spokane, Washington, Line Segment 037, Milepost 1475.88. Sheet 330 - 6513 - 6, undated.
Burlington Northern Engineering Drawing: Remodel Details, Bridge 387 - Tye River (formerly Great Northern), Scenic, Washington, Line Segment 037, Milepost 1708.3. Sheet 253 - 4020 - 17, 1985.