Burlington Northern Engineering Drawing: Pressure Treated Deck Plan, Bridge 8.8 - Oregon Slough, north of North Portland Junction, Oregon, Line Segment 047, Milepost 8.62. Sheet 229 - 8063 - 1, 1978.
Burlington Northern Engineering Drawing: Prestressed Concrete Beam, Bridge 119.9 - 6th Street (formerly Great Northern), Great Falls, Montana, Line Segment 353, Milepost 119.9. Sheet 384 - 8339, undated.
Burlington Northern Engineering Drawing: Prestressed Concrete "T" Girder, Bridge 12 - Drainage Channel (formerly Northern Pacific), Orillia, Washington, Line Segment 051, Milepost 12.3. Sheet 116 - 8143 - 19, 1986. Note: Concrete span
Burlington Northern Engineering Drawing: Profile With Shims, Bridge 36 - Clark Fork River (formerly Northern Pacific), west of Thompson Falls, Montana, Line Segment 044, Milepost 36.6. Sheet VF1077 - 5, 1970.
Burlington Northern Engineering Drawing: Profile, Bridge 333 - Crab Creek (formerly Great Northern), west of Gibson, Washington, Line Segment 037, Milepost 1567.41. Sheet 183 - 3057 - S2, 1984.
Burlington Northern Engineering Drawing: Proposed Culvert 129.06, Culverts. Sheet K - 4 - 3, undated.
Burlington Northern Engineering Drawing: Proposed General Plan, Bridge 370 - Wenatchee River (formerly Great Northern), west of Cashmere, Washington, Line Segment 037, Milepost 1664.4. Sheet 186 - 1374, 1976. Note: Proposal
Burlington Northern Engineering Drawing: Proposed Plan, Bridge 130 Curlew Lake (formerly Great Northern), west of Malo, Washington, Line Segment 377, Milepost 69.20. Sheet 132 - 4816 - 2, 1980.
Burlington Northern Engineering Drawing: Proposed Plan, Bridge 18.8 - Shattuck Street - Renton (formerly Pacific Coast then Great Northern), Renton, Washington, Line Segment 410, Milepost 11.8. Sheet 323 - 8219 - A, 1980.
Burlington Northern Engineering Drawing: Proposed Plan, Bridge 370 - Wenatchee River (formerly Great Northern), west of Cashmere, Washington, Line Segment 037, Milepost 1664.4. Sheet 186 - 1374 - A, 1976.