Burlington Northern Engineering Drawing: Pier Details, Bridge, Colville River, Washington, Line Segment 376, Milepost 0.20. Sheet 254 - 6782 - 2, undated.
Burlington Northern Engineering Drawing: Pier Renewal, Bridge 102.5 - Creek (formerly Great Northern), west of Scobey, Montana, Line Segment 355, Milepost 102.5. Sheet 246 - 3727 - 27, 1971.
Burlington Northern Engineering Drawing: Piers Number 2, 3 and Number 4 Details, Bridge 119.9 - 6th Street (formerly Great Northern), Great Falls, Montana, Line Segment 353, Milepost 119.9. Sheet 384 - 8339, undated.
Burlington Northern Engineering Drawing: Piers, Bridge 1487.2 - Old Trails Road (formerly Great Northern), west of Latah Junction, Washington, Line Segment 037, Milepost 1487.15. Sheet 337 - 6389 - 4, 1971.
Burlington Northern Engineering Drawing: Pile Plan/General Plan, Bridge E83.6 - Underpass, south of Orville, Oregon, Line Segment 442, Milepost 83.56. Sheet WX - 199, 1981.
Burlington Northern Engineering Drawing: Piling and Anchoring Plans, Bridge 1475.9 - Spokane River (formerly Great Northern), Spokane, Washington, Line Segment 037, Milepost 1475.88. Sheet 330 - 6513 - 2, undated.
Burlington Northern Engineering Drawing: Pit Reinforcement Plan, Track Scale (formerly Northern Pacific), Longview, Washington, Line Segment 613. Sheet 245 - 6964 - 2, 1975.
Burlington Northern Engineering Drawing: Pit Requirements, Scale, Albany, Oregon. Sheet 6055931, undated.
Burlington Northern Engineering Drawing: Plan - 18 Foot X 16 Foot Arch, Culverts, undated.
Burlington Northern Engineering Drawing: Plan - Bearing Assembly, Bridge 63.5 - Axton Road (formerly Great Northern), north of Brennan, Washington, Line Segment 050, Milepost 105.7. Sheet 372 - 8051, undated.