Burlington Northern Engineering Drawing: General Plan, Construction Bridge - Ft. Peck Dam, Fort Peck, Montana, Line Segment 999. Sheet 289 - 5288 - 2, undated. Note: Butte Quarry Railroad for Fort Peck Dam
Burlington Northern Engineering Drawing: General Plan, Construction Bridge - Fort Peck Dam, Fort Peck, Montana, Line Segment 999. Sheet 289 - 5288 - 1, undated. Note: Butte Quarry Railroad for Fort Peck Dam
Burlington Northern Engineering Drawing: General Plan, Culverts. Sheet 00 - 611, undated.
Burlington Northern Engineering Drawing: General Plan, Pacific Coast Railroad - Bridge 11.7 (formerly Great Northern), east of Renton, Washington, Line Segment 410, Milepost 11.7. Sheet 323 - 6170 - 5, 1980. Note: Steel spans
Burlington Northern Engineering Drawing: General Plan, Signal Bridge, Bonners Ferry, Idaho, Line Segment 999. Sheet 317 - 6475 - 3, 1968.
Burlington Northern Engineering Drawing: General Plan, Signal Bridge, Burnaby, British Columbia, Line Segment 056. Sheet 317 - 6451 - 6, 1969.
Burlington Northern Engineering Drawing: General Plan, Signal Bridges - New Westminster to Willingdon Junction (formerly Great Northern), north of New Westminster, British Columbia, Line Segment 056. Sheet 324 - 8005 - 9, 1977. Note: Signal bridges
Burlington Northern Engineering Drawing: General Plan/Elevation, Bridge 1481.9 - Sunset Highway (formerly Great Northern), west of Spokane, Washington, Line Segment 037, Milepost 1481.95. Sheet 337 - 6383 - 4, 1971.
Burlington Northern Engineering Drawing: General Plan/Elevation, Bridge 1482.9 - Greenwood (formerly Great Northern), west of Spokane, Washington, Line Segment 037, Milepost 1482.80. Sheet 337 - 6385 - 2, 1971.
Burlington Northern Engineering Drawing: General Plan/Elevation, Bridge 374.8 - 13th Street, south of Latah Junction, Washington, Line Segment 047, Milepost 374.79. Sheet 330 - 6515 - 4, 1970. Note: Steel span