Burlington Northern Engineering Drawing: 16 Foot Concrete Arch Culvert, Culverts. Sheet K - 4 - 7, undated.
Burlington Northern Engineering Drawing: 16 Foot Concrete Arch Culvert, Culverts. Sheet J - 8 - 4, undated.
Burlington Northern Engineering Drawing: 16 Foot Concrete Arch Culvert, Culverts. Sheet J - 8 - 3, undated.
Burlington Northern Engineering Drawing: 16 Foot X 15 Foot Box Culvert, Culverts. Sheet NO - 275, undated.
Burlington Northern Engineering Drawing: 16 Foot X 15 Foot Box Culvert, Culverts. Sheet NO - 260, undated.
Burlington Northern Engineering Drawing: 2 Spans - 70 Foot Deck Plate Girder (DPG), Bridge 6 - Redmond Way (formerly Northern Pacific), Redmond, Washington, Line Segment 404, Milepost 6.2. Sheet 1072 - 15, 1972. Note: Steel span
Burlington Northern Engineering Drawing: 20 Foot Concrete Arch Culvert, Culverts. Sheet J - 8 - 4, undated.
Burlington Northern Engineering Drawing: 200 Foot Through Steel Truss, Construction Bridge - Fort Peck Dam, Wiota, Montana, Line Segment 999, undated.
Burlington Northern Engineering Drawing: 200 Foot Truss, Kettle River (formerly Great Northern), west of Kettle Falls, Washington, Line Segment 377, Milepost 8.41. Sheet 291 - 5301, 1973.
Burlington Northern Engineering Drawing: 24 Foot Reinforcement - Arch, Culverts. Sheet AA - 355, 1913.