Showing 142770 results

Archival description
Print preview View:

17105 results with digital objects Show results with digital objects

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Washtucna, Washington, 1911.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 266. Building bridge on spur track and rebuilding of 1075 feet of ditch at Washtucna, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 323. Correspondence File Number 313-7P. Vancouver Division. Other subject categories: Bridge Construction.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Washtucna, Washington, 1911.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 313. Grading of crossing on industrial spur at Canal Street at Washtucna, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 376. Correspondence File Number 313-1. Vancouver Division. Other subject categories: Road Crossing.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Washtucna, Washington, 1911.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 393. Extending present spur 60 feet at Washtucna, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 466. Correspondence File Number 313-1. Vancouver Division. Other subject categories: Tracks Spur.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Washtucna, Washington, 1911.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 260. Installing air sand hoist at Washtucna, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 317. Correspondence File Number 313-3. Vancouver Division. Other subject categories: Structure Sand Hoist.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Washtucna, Washington, 1910.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 208. Switching spur at Washtucna, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 260. Correspondence File Number 303-1. Vancouver Division. Other subject categories: Tracks Spur.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Washtucna, Washington, 1910.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 237. Siding at Washtucna, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 286. Correspondence File Number 313. Vancouver Division. Other subject categories: Tracks Siding.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Washtucna, Washington, 1909.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 34. Construct warehouse spur at Washtucna, Washington. Chief Engineer/Standard Maintenance Procedure AFE Number CE 41. Correspondence File Number 313-1. Vancouver Division. Other subject categories: Tracks Spur.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Washtucna, Washington and Glavin, Washington, 1916.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1483. CREDIT - Take up 13,854 lineal feet of 85 pound rail on the warehouse spur at Washtucna, Washington, and replace with 60 pound and 66 pound rail from the Glavin borrow pit, account contractors releasing rail in Glavin pit and the 85 pound rail is needed for emergency use on the main line. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1573. Correspondence File Number 33-1. Vancouver Division. Other subject categories: Tracks Rail Replacement.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE), Washtucna (near), Washington, 1917.

Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1766. Renew with standard frame trestle bridge No. 288-9, located 2.1 miles west of Washtucna, Washington, extending each end 8 feet to do away with high bulkheads. Present length of trestle 115 feet. Proposed length 131 feet. Necessary to renew trestle. Work provided for by 1917 work sheet. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1828. Correspondence File Number 34-27. Vancouver Division. Other subject categories: Bridge.

Results 1091 to 1100 of 142770