- US WaBuPNRA BB030710
- Item
- undated
Milwaukee Road Engineering Drawing: Details of Abutment 1, Bridge 24.33 - Highway, between Palouse, Washington and Bovill, Idaho, Line Segment 396, Milepost 24.24. Sheet 388 - 8732 - 5, undated.
Milwaukee Road Engineering Drawing: Details of Abutment 1, Bridge 24.33 - Highway, between Palouse, Washington and Bovill, Idaho, Line Segment 396, Milepost 24.24. Sheet 388 - 8732 - 5, undated.