Great Northern Engineering Drawing: Tie Plan, Bridge 5.1, South of Henley, Oregon, undated
- US WaBuPNRA D0027-003-009-008-001-BB024711
- Item
- undated
Part of Timothy Miller Collection
Great Northern Engineering Drawing: Tie Plan, Bridge 5.1, south of Henley, Oregon, Line Segment 055, Milepost 5.11. Sheet 275 - 4512 - 3, undated.