Spokane, Portland and Seattle Railway Authorization for Expenditure (AFE). President's AFE Number 1519. Extend the 24 inch cast iron pipe culvert No. 262-23, 24 feet, and build a wooden flume 1 foot by 2 foot to connect with the pipe under the Northern Pacific Railway Co's track, and place 500 cubic yards of fill over the crib and pipe at Burr Siding to provide drainage and strengthen the embankment for safe operation of trains. Chief Engineer/Standard Maintenance Procedure AFE Number CE 1597. Correspondence File Number 383. Vancouver Division. Other subject categories: Culvert.
Elements area
Taxonomy
Code
Scope note(s)
Source note(s)
Taken From list of SP&S Stations and Spurs.