- US WaBuPNRA D0027-004-009-008-001-BB028215
- Item
- undated
Part of Timothy Miller Collection
Northern Pacific Engineering Drawing: Tie Plan, Bridge 9 - Black River, Black River, Washington, Line Segment 051, Milepost 9.7. Sheet 433 - 26, undated.
18 results directly related Exclude narrower terms
Part of Timothy Miller Collection
Northern Pacific Engineering Drawing: Tie Plan, Bridge 9 - Black River, Black River, Washington, Line Segment 051, Milepost 9.7. Sheet 433 - 26, undated.
Part of Timothy Miller Collection
Northern Pacific Engineering Drawing: Tie Plan, Bridge 10 - Highway, south of Black River, Washington, Line Segment 051, Milepost 10.8. Sheet 1274 - 49, undated.
Part of Timothy Miller Collection
Northern Pacific Engineering Drawing: Section, Bridge 9 - Black River, Black River, Washington, Line Segment 051, Milepost 9.7. Sheet 433 - 26, undated.
Part of Timothy Miller Collection
Northern Pacific Engineering Drawing: Repair to Lateral Bracing, Bridge 9 - Black River, Black River, Washington, Line Segment 051, Milepost 9.7, undated.
Part of Timothy Miller Collection
Northern Pacific Engineering Drawing: Repair Concrete Bearing Block, Bridge 9 - Black River, Black River, Washington, Line Segment 051, Milepost 9.7, undated.
Part of Timothy Miller Collection
Northern Pacific Engineering Drawing: Proposed Replacement, Bridge 10 - Highway, south of Black River, Washington, Line Segment 051, Milepost 10.8. Sheet 1274 - 49, 1947. Note: Steel beam and AFE timber trestle
Part of Timothy Miller Collection
Northern Pacific Engineering Drawing: Piers, Bridge 9 - Black River, Black River, Washington, Line Segment 051, Milepost 9.7. Sheet 433 - 26, undated.
Part of Timothy Miller Collection
Northern Pacific Engineering Drawing: Piers, Bridge 9 - Black River, Black River, Washington, Line Segment 051, Milepost 9.7. Sheet 433 - 26, undated.
Part of Timothy Miller Collection
Northern Pacific Engineering Drawing: Pier/Abutment, Bridge 9 - Black River, Black River, Washington, Line Segment 051, Milepost 9.7. Sheet 433 - 26, undated.
Part of Timothy Miller Collection
Northern Pacific Engineering Drawing: Lateral Bracing, Bridge 10 - Highway, south of Black River, Washington, Line Segment 051, Milepost 10.8, undated.